Friday, February 15, 2013

Baby steps in project progress

I made some progress on a few projects today.  Nothing incredibly tangible, but a fair amount of prep work.

I made a trip to The Forklift during my lunch break today to buy some supplies.  I picked up some conduit and a few brackets for the watermelon trellis as well as some wood for an elevated hose reel I'll be constructing.  I plan to sink the reel next to the bench inside the gate.

After work, I painted the bottoms of the two tall vertical pieces for the trellis and touched up the paint on the short ones.

No comments:

Post a Comment